Governor Inslee releases Phase 2 Construction Guidelines

Thanks to the efforts of BIA, BIAW, local elected officials, and our members, the governor has agreed to Phase 2 Construction Guidelines.

When authorized in Clark County, Phase 2 would allow all construction activities to restart, including those activities not authorized under Construction Phase 1. Current local “Phase 2” counties are Skamania and Wahkiakum. Read the memo.

Highlights

  • All construction is allowed
  • Requires Jobsite Hazard Analysis to be performed
  • A copy of the COVID-19 Exposure Control, Mitigation, and Recovery Plan must be available on each job site during any construction activities
  • Individuals working alone not required to wear PPE
  • Workers able to perform tasks with less than 6-foot interaction distance (require higher level of PPE*)
  • Temperature and symptom screening can be done at home and reported to the employer
  • Jobsite Safety Plan, Phase 1 Safety Requirements, Work to be Performed and Coronavirus Prevention documents no longer required to be posted
  • Visitor’s log is no longer required
  • Gloves and eye protection worn at all times is no longer required (eye protection required for tasks under 6’)
  • Limit of one trade on-site is no longer required but is highly recommended

Visit our online PPE store to purchase supplies.

*Review L&I’s “Face Coverings, Masks, and Respirator Choices” to plan for appropriate PPE.

GET PREPARED: Watch BIAW’s Phase 2 Safety Requirements webinar.